![]() |
First day on the garage build
Well,here's what they got done so far...They could have done much more but waited on the inspector for three hours...
|
Waiting on an inspector always sucks. Progress is progress though, at least it's getting done.
|
whos doing it ashley? what is the actual size of it?
|
30x50x12 with 200 sq ft of concrete out frt...JR Barden construction out of neeses...18,500
|
thats concrete and erected? how many doors?
|
Yeah,thats turnkey..# 10x10 comercial can doors,1 walk through,and one 4x4 window
|
boy am i jealous. how much is it going to run ya if you dont mind me askin? ballpark?
|
Quote:
Quote:
|
it says 18,500 a couple posts up. how many 10x10 doors?
|
I think # means 3
|
must be pineville lingo, im suprised you caught that lol.
|
lmao... i read earlier and didnt see the price posted. so when it dawned on me to ask how much it was i didnt re-read.
facepalm. |
Yeah 3,,, I have waited and saved a long time to get this though..I had to give up buying a fulton engine to buy it.. It's really bad now since the engine in the car has taken a shit...But atleast it can sit in the garage on my new drive on lift....lol...
|
Awesome.
|
Well,its nothing like yall's......Damn wharehouse.....
|
i want one so bad i cant stand it. once my house is refinanced its gonna be ON. shooting for maybe a 30x40 or 40x40 if i can squeeze it without it looking crazy.
|
Any electrical included?
|
Mine is 2600 sq ft. It has a two post lift, heat, 120 and 240 power and a full bathroom. I need to coat the floor in it and the attached garage. Kinda still debating for meow.
|
Quote:
|
Quote:
|
| All times are GMT -4. The time now is 02:24 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.